Building & renovating

Every alteration, pool, wall and repaint needs approval before work starts. Here is the actual process, step by step.

Van Riebeeckshof is a designed neighbourhood, and the association’s approval exists to protect that, and the value of your property. The rule is simple and it is enforced: no building activity starts before both the association and the City have approved the plans.

That includes work you might not think of as “building”: a swimming pool, a boundary wall, a carport, a new gate, solar panels, a water tank, air-conditioning units, and repainting the outside of the house.

Do this first. Before you appoint anyone, phone the managing agent on 021 943 4340 and describe what you want to do. It takes ten minutes and it prevents the most expensive mistakes, plans drawn twice, or work stopped mid-site.

Building procedure 2026, the official PDF

The process, in order

Every step below happens by e-mail, in PDF. There are no printed sets and nothing to collect in person.

  1. Check what applies. Read the rules summary and the relevant sections of the Guidelines & Rules of Conduct. If anything is unclear, ask Capecore or the managing architect, Danie de Wet.
  2. Have plans drawn. Working drawings prepared to City by-laws and to the association’s design standards, issued as PDF. A registered architect or draughtsperson will know the format.
  3. E-mail the PDF to Capecore. The managing agent forwards it to the managing architect, Danie de Wet, for the association’s approval.
  4. The managing architect approves. Danie de Wet e-mails the approved plans back to Capecore. If something has to change, this is where it is picked up.
  5. Pay the approval fee. Capecore e-mails you the fee details. Once payment is in, they send you the approved plans.
  6. Get City approval. The plans also go to the City of Cape Town (Tygerberg administration) for building plan approval. Council fees are for your account.
  7. Send the approved copy back before you build. A copy of the plans approved by Danie de Wet and by the local authority must be e-mailed to Capecore before any building may start.
  8. Build. The association may inspect the site during working hours to check compliance, and can issue a stop-work order. The initial building must be finished within nine months; a phased project needs written permission and the first phase must meet the minimum floor area.
  9. Request the final inspection. When the work is finished, ask for a final inspection by e-mail.
  10. Send the Occupation Certificate. A copy must be e-mailed to Capecore before the building deposit is refunded.

What the design rules require

Item Requirement
Height Two storeys maximum (ground plus first floor). More needs City approval, neighbours’ consent and the association’s approval.
Floor area Minimum 200 m² per dwelling, excluding outbuildings and garages.
Boundary walls Maximum 2 m from natural ground. No pre-cast concrete. Plastered and painted on every face, including the side facing a green belt.
Palisade / fence Maximum 1.8 m, between columns set roughly 3–5 m apart. Painted historic green, charcoal, black or white.
Roofs Pitch between 25° and 45°. Flat roofs concealed behind a fascia, beam or parapet, and not visible from the street.
Solar panels Integrated into the roof, not mounted on a frame, and (where practical) not visible from the street. Must be on the plans.
Water tanks Integrated, covered, not visible from the road, and shown on the plans. No tanks on a sub-structure.
Mechanical plant Air-conditioners, pool pumps, ducts and grills screened from the street and from neighbours, and shown on the plans.
External paint Warm neutral or light earth tones. Colour combinations must be approved before painting starts. The rules include a list of NCS colours that may not be used.

Fees and deposits

The approval fee is paid to Capecore when the plans are approved. The building deposit is refundable and is paid to the association’s own building deposit account, not to the managing agent.

Item Alterations New home
Plan approval fee (to Capecore) R1 650 R2 250
Refundable building deposit (to VRH) R5 000 R15 000

Plan approval fee, paid to Capecore Property Management: First National Bank, branch 250655, account 62899937076.

Building deposit, paid to Van Riebeeckshof: ABSA, branch 632005, account 9262861394. It is refunded once the final inspection has been done and the Occupation Certificate has been received.

Fees are set by the trustees and can change. Confirm the amount with Capecore before you pay.

Rules for contractors on site

  • Hours: Monday to Friday 08:00–18:00, Saturday 08:00–17:00. No work on Sundays or public holidays. Anything outside those hours needs the neighbours’ and the association’s prior permission.
  • Rubble: removed weekly by the contractor, never dumped on open space or in the green belt, and never burnt on site.
  • Deliveries: weekdays only, during normal working hours. Material off-loaded in the street must be moved onto the site immediately.
  • Site conduct: the roadway and pavement kept clean, toilet facilities provided, one watchman allowed overnight, and all contractor boards consolidated onto a single board.

If work is done without approval

The association can issue a stop-work order and, in serious cases, apply to court for an interdict at the owner’s cost. It can also refuse to consider plans from an owner who is not in good standing. The cheaper path is always the first one.